SALT PREPARATION PLANT
Plant for the production of saline solutions
The Inox Meccanica brine preparation system has been designed to ensure precision, hygiene, and continuity in industrial salting processes. The entire system is built around two main tanks: one dedicated to water storage, equipped with an automatic cooling system to maintain the ideal temperature, and a second tank dedicated to salt dissolution, complete with a remounting mixer (Triblender) directly installed on the structure.
The management of loading, unloading, and remounting flows is carried out through butterfly valves with pneumatic actuators, equipped with solenoid heads and position sensors, ensuring operational reliability and safety. The technical skid integrates the plate heat exchanger, pumps, valves, and connections required to ensure a constant and controlled flow between the tanks and the mixer, making the system compact and easily integrable in-line.
Fully automated, the system is equipped with temperature and level sensors, as well as a flowmeter for accurate monitoring of process parameters. All functions are managed via a touch-screen operator panel, providing simple and intuitive control of the various phases, with a multilingual interface and dedicated software.
The AISI 304 stainless steel construction, with tanks mounted on adjustable feet, ensures strength, hygiene, and easy cleaning. Thanks to these features, the system represents a technologically advanced solution for the rapid and homogeneous preparation of brine, optimizing production processes while ensuring high quality and consistent hygienic standards.
Technical data and layout

| 5119x2502x2623 mm | |
| 1800 Kg | |
| 8Kw – 400V – 50Hz | |
| CE |
*The data in the table above may vary depending on the version and equipment chosen.
Main plant stages
- Load water into tank S1 in the set quantity: pneumatic valve opens to the level read by the pressure probe.
- Tank cooling S1: pump start-up in rebuild through the cooling system until the set temperature is reached.
- Discharge from tank S1 to tank S2 of the set quantity: start pump, open transfer valve until the litres read by flowmeter 1 are reached.
- Dissolving salt in tank S2: starting mixer/blender pump, opening of replacement valve.
- S2 tank cooling with only temperature indication manual operator control.
- Only tank weight indication S2.
- Discharge from tank S2 to the churn of the set quantity: start of mixer/blender pump, opening of transfer valve, until the litres read by flowmeter 2 are reached.
- Operator-controlled washing of the two tanks via pneumatic ball valves.